Posts Tagged Putuo district
Putuo district of Shanghai municipal construction
Posted by lisa in Putuo district, shanghai on November 11th, 2009
Municipal infrastructure to speed up the construction. Actively coordinate with adjacent to the major municipal infrastructure, etc, to carry out comprehensive rail transit line 7, 11 prophase work has started construction site, part. LanGao south block and gold meet drainage system built using. Continue to promote area road network construction. In road traffic line. Municipal road (including new paved roads) 63,000 much square metre, DaoBan color 54550 square meters, the revision of the new increase road 4.22 million square meters.
The construction of urban planning administration] residential housing construction work continuously strengthen, total control effectively. Year-round 582.41 million square meters of housing construction, including new area, 139.81 million square meters, Residence complete 165.96 area 10,000 square meters, construction area of complete public facilities 61.59 million square metre, public facilities completed 11.51 area million square meters. Create “four high” excellent residential 5, the implementation of the pilot residence decorate menu of 1974.
The old area reconstruction efforts to attack. Complete residents and dismantle old 3518 resettlement in rural and ZhaiJi 25.6 million square meters of old. Advancing wang village, nine first-class key transformation between the resettlement work completed, plots of resettlement ending eight base. To speed up the construction and raise major projects, and supporting commodity housing area of 32.90 raise matching million square meters. Complete “flat slope” instead 22.30 million square meters, the old housing comprehensive 115.10 million square meters.
The environmental protection and environmental control and consolidating achievement. And expand. Implement the city, the second round three action plan, new environmental public green space, 41 hectares, wang green, wuning along the bank of the public green space of large construction projects. Actively appearance standards, norms and demonstration area to create jobs, main roads and key regional environment improved obviously. To strengthen regional comprehensive river channel, 9 basically eliminate black smelly task. Strengthening prevention and control of atmospheric pollution and promote taopu comprehensive industrial pollution of the environment. City grid management system and mechanism, perfecting gradually law enforcement management effectiveness. Illegal building demolition 10.78 million square meters. The noise of the grid environment to function.
The industrial boiler for 56, 6 year, pits furnace HaoMeiLiang 13.49 tons. Fuel burning sulfur dioxide emissions process, with the same period last year was tons of flat, Total emissions 303582 million cubic meters and standard for 51% lower than the same period last year, Soot emissions 44.58 tons, 35.18% lower than the same period last year. Average annual area for so2, no2 0.07 mg/m3 in average 0.080 mg/m3, the atmosphere in the average for 0.105 milligram /, 7.9. ShouJiZhan compressed into life rubbish in September, new public toilets, 2 reconstruction, the toilet of life and garbage collection rate 70%, classified collection rate of fire area was 100%. Sanitation facilities and transformation, remove rubbish 156 exposure by tons.
With the appearance of the status quo of environment, years of “three create” work as an important means to create municipal civilization city, and achieved good effect. “Three areas” creating effective, create a new changzheng town, streets, YiChuan caoyang street, such as the way of administrative jurisdiction appearance, redtown regulate regional 1.35 square kilometers, the city landscape engineering in an all-round way. Years newly built, rebuilt 2,871 in flood walls, dredging earthwork 86 million square meters.